
OEM Key plastic part for intelligent home device , Plastic thread , High precision
Mould information
1.Mould standard | DME / HASCO / MISUMI / LKM |
2.Mould type | 2 plate |
3.Mould base steel | S55C |
4.A/B plate steel | Chinese P20 |
5.Core/Caviry steel | Imported H13 |
6.Runner type | Cold runner |
7.Gate type | Edge gate |
8.Project name | Intelligent home device |
9.Part name | Thread pillar |
10.Material available | POM / PA66 |
11.Shrinkage rate | 1.019 |
12.Part color | Nature / Black / Blue / Green |
13.Surface finishing | Generial polishing |
14.Cycle time | 20s |
15.Injection machine | 60T |
16.Injection machine brand | Arburg / Fanuc / Haitian |
17.2D Mould structure | CAD Software (DWG, DXF Format) |
18.3D Mould structure | UG, Proe Software (Prt, X-T, stp, step, Igs, Iges, Format etc.) |
19.Mould folw report | CAD Mould flow (PPT format) |
20.Mould processing report | Update each week |
21.MOQ | 1 set |
22.Payment term | T/T |
23.Package | Custom Wooden box |
24.Deliverly date | 30 days |
25.Mould number | According to customer requirement |
26.Mould life | 1 million shots |
FAQ
Q: How can you get the quotation?
When we get the detailed information during working days, we will provide you the quotation within 24 hours.
Please help to provide us the following information with your inquiry.
1) 2D Part drawing. (CAD or DXF format)
2) 3D Part drawing. (Prt, X-T, stp, step, Igs, Iges, Format etc.)
3) Mould cavity. (1*1 or 1*2 or 1*4 etc.)
3) Part Material. (Material requirement or Material date sheet)
4) Mould standard. (DME or HASCO or LKM)
5) Mould standard component. (DME or HASCO or MISUMI or LKM)
6) Mould Steel.
7) Part surface treatment.
8) Quantity of plastic part. (per order / per month / annual)
9) Mould life.
10) Any special demands or requirements, such as packing,
labels,delivery etc.
Q: What are the main oversea markets of Forwa?
1)Currently Forwa regular oversea customers are from the USA, the
UK, Italy, Germany, France and India etc.
Q: How do we control the quality?
1). When getting the new order, Our team will open a meeting to
analyze the part stucture and mould stucture carefully to ensure
everyting is great.
2). Our team will review the mould design and improve it to ensure
mould life and mould operation before start to build the mould.
3). The project team will follow each step mould processing to ensure the mould processing on time and the mould processing quality.
4). Our QC team will inspect all the mould components after each processing step finish and then go next step.
5). Our technical team will fit the mould carefully.
6). After the mould completed, our project team will check the mould operation before testing the mould.
7). Mould need to run about 3~4 hours during testing to ensure the mould operation.
8). The first sample inspected by QC and then provide the good samples to customer for testing.
9). During production, our IPQC will check the parts per 2 hours,
ensure no any rejects;
10). FQC will check the products before sending to the warehouse;
11). 100% inspected by OQC before shipping out.
Q: What should we do if customer receive defective products?
1): If receive defective product, please send us the photos, we
will feedback to our engineers and QC departments and solve the
problems ASAP.
Q: How to pack the moulds and products?
1).For moulds, we will be coated one-layer anti-rust oil first,and
then also will be covered thin films on the mould, finally pack
into fumigation wooden case.
2).And as to products, we will pack into standard export cartons or
as per customer’s request to pack.
FORWA PRECISE PLASTIC MOULD CO.,LTD.
Being the leading plastic mold maker in China, Forwa has been
actively and sincerely striving to improve itself. And we have been
doing a good job in mold making and plastic parts
manufacturing and have much to its credit.
Assembling of manufacturing, design, engineering and marketing, our
company has engaged ourselves in the field of mold making and
plastic part molding and won the title of the ISO9001:2000
certificated corporation which has introduced the 5S system into
the management. In order to fulfill the requirements of different
clients correctly and effectively, we built up a special team
called cost and technology team to do the DFM (design for
manufacture) to customers for each project.
Now, our products, including various components of automobile,
electron, computer peripheral, house application, industrial
application and medical application, have been sold all over the
world and win the favorable comment from the customers.
We are a team of premier manufacturing sites, which is capable to handle the whole project, including design, tooling, manufacturing, printing, assembly, package, shipping arrangement. It is not only for metal fabrication, but also for injection molding, even the combination. |
Being the professional in this line with adequate fund, we have various advanced facilities in house most of them are imported from Japan, Germany, and the USA. In order to keep all of our staffs to be stable and well-educated,
we devote a lot into the education and training, especially for the
engineers and technicians. Therefore, all of them are always
proficient in operating the updated machines introduced by the
company. ![]() |
Our honorific customer
Forwa has gone from strength to strength by improving good quality and excellent service as well as client' reliability.
Forwa pays much more attention to technician training and corporate
culture development.
Forwa will be your best partner and always with you to create
briliant tomorrow.